大华彩票在线网址

  • <tr id='GHlOCs'><strong id='GHlOCs'></strong><small id='GHlOCs'></small><button id='GHlOCs'></button><li id='GHlOCs'><noscript id='GHlOCs'><big id='GHlOCs'></big><dt id='GHlOCs'></dt></noscript></li></tr><ol id='GHlOCs'><option id='GHlOCs'><table id='GHlOCs'><blockquote id='GHlOCs'><tbody id='GHlOCs'></tbody></blockquote></table></option></ol><u id='GHlOCs'></u><kbd id='GHlOCs'><kbd id='GHlOCs'></kbd></kbd>

    <code id='GHlOCs'><strong id='GHlOCs'></strong></code>

    <fieldset id='GHlOCs'></fieldset>
          <span id='GHlOCs'></span>

              <ins id='GHlOCs'></ins>
              <acronym id='GHlOCs'><em id='GHlOCs'></em><td id='GHlOCs'><div id='GHlOCs'></div></td></acronym><address id='GHlOCs'><big id='GHlOCs'><big id='GHlOCs'></big><legend id='GHlOCs'></legend></big></address>

              <i id='GHlOCs'><div id='GHlOCs'><ins id='GHlOCs'></ins></div></i>
              <i id='GHlOCs'></i>
            1. <dl id='GHlOCs'></dl>
              1. <blockquote id='GHlOCs'><q id='GHlOCs'><noscript id='GHlOCs'></noscript><dt id='GHlOCs'></dt></q></blockquote><noframes id='GHlOCs'><i id='GHlOCs'></i>

                Singapore Metro Thomson MRT line section T206

                  详细说明

                  Singapore Thomson Metro Line Contract-T206 Project

                  Contract date :4/2014

                  Engineering Contractor :Shanghai tunnel engineering co. (Singapore) PTE. Ltd.

                  TBM supplier:Herrenknecht

                  Slurry separation equipment models:MTP-650*2          

                  Filter press models:HAZG500/1600-U*2

                  The excavation diameter of TBM:6.6m    

                  Tunneling distance:2354m

                  Maximum Tunneling speed:4 cm/min

                  Slurry flow:650m/h (During Tunneling),Feeding flow:600m/h (Bypass type)

                  Feeding density:1.1t/ m

                  Slurry density:1.25t/m

                  Exhaust pipe into the slurry and slurry pipe diameter:DN250