welcome购彩网

  • <tr id='VdQG4t'><strong id='VdQG4t'></strong><small id='VdQG4t'></small><button id='VdQG4t'></button><li id='VdQG4t'><noscript id='VdQG4t'><big id='VdQG4t'></big><dt id='VdQG4t'></dt></noscript></li></tr><ol id='VdQG4t'><option id='VdQG4t'><table id='VdQG4t'><blockquote id='VdQG4t'><tbody id='VdQG4t'></tbody></blockquote></table></option></ol><u id='VdQG4t'></u><kbd id='VdQG4t'><kbd id='VdQG4t'></kbd></kbd>

    <code id='VdQG4t'><strong id='VdQG4t'></strong></code>

    <fieldset id='VdQG4t'></fieldset>
          <span id='VdQG4t'></span>

              <ins id='VdQG4t'></ins>
              <acronym id='VdQG4t'><em id='VdQG4t'></em><td id='VdQG4t'><div id='VdQG4t'></div></td></acronym><address id='VdQG4t'><big id='VdQG4t'><big id='VdQG4t'></big><legend id='VdQG4t'></legend></big></address>

              <i id='VdQG4t'><div id='VdQG4t'><ins id='VdQG4t'></ins></div></i>
              <i id='VdQG4t'></i>
            1. <dl id='VdQG4t'></dl>
              1. <blockquote id='VdQG4t'><q id='VdQG4t'><noscript id='VdQG4t'></noscript><dt id='VdQG4t'></dt></q></blockquote><noframes id='VdQG4t'><i id='VdQG4t'></i>

                Shanghai Metro Line 18 phase II project, Changjiang West Road station to Jiangyang South Road station section of the downbound line shield smooth start

                * 来源: 上海发布 * 作者: admin * 发表时间: 2023/05/10 9:21:41 * 浏览: 15

                Recently, with the slow start of China Railway No. 203 shield tunneling machine cutter, Shanghai Rail Line 18 Phase II project civil construction 1 standard section of Yangtze West Road station - Jiangyang South Road station shield tunneling started smoothly.

                The downhill line is 861 meters in total and is received at the east end of Jiangyang South Road Station. As the first section shield of Line 18 phase II project, its smooth start marks the construction of Shanghai rail transit Line 18 phase II has entered a new stage.